Feature Job – HAKE Rigging 250 Ton Transfomer

HAKE Rigging 250 ton transformer on the move
Baltimore, MD – At the end of July, Flanigan assisted HAKE Rigging with a “BIG Move”.
The project began when a brand new transformer, weighing roughly 500,000 pounds, arrived on a barge at Vulcan Stone’s quarry in Havre De Grace. Flanigan shaped up a stone ramp so the rig could be driven off the barge, and even supplied two dozers to help stabilize the barge during unloading.

