<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>P. Flanigan &#38; Sons, Inc. &#187; interstate 95</title>
	<atom:link href="http://www.pflanigan.com/tag/interstate-95/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.pflanigan.com</link>
	<description>Construction and Material Supply, Baltimore, MD</description>
	<lastBuildDate>Fri, 03 Feb 2012 15:30:20 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>Feature Job – HAKE Rigging 250 Ton Transfomer</title>
		<link>http://www.pflanigan.com/blog/feature-job-hake-rigging-250-ton-transfomer/</link>
		<comments>http://www.pflanigan.com/blog/feature-job-hake-rigging-250-ton-transfomer/#comments</comments>
		<pubDate>Mon, 28 Sep 2009 12:26:51 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[hake rigging]]></category>
		<category><![CDATA[interstate 95]]></category>
		<category><![CDATA[md I-95]]></category>
		<category><![CDATA[transformer]]></category>

		<guid isPermaLink="false">http://www.pflanigan.com/?p=387</guid>
		<description><![CDATA[At the end of July, Flanigan assisted HAKE Rigging with a "BIG Move".]]></description>
			<content:encoded><![CDATA[<div id="attachment_388" class="wp-caption alignleft" style="width: 535px"><img class="size-medium wp-image-388" title="2111-hake-riggingvulcan-quarry-038" src="http://www.pflanigan.com/wp-content/uploads/2009/09/2111-hake-riggingvulcan-quarry-038-300x239.jpg" alt="HAKE Rigging 250 ton transformer on the move" width="525" height="418" /><p class="wp-caption-text">HAKE Rigging 250 ton transformer on the move</p></div>
<p>Baltimore, MD – At the end of July, Flanigan assisted HAKE Rigging with a &#8220;BIG Move&#8221;.</p>
<p>The project began when a brand new transformer, weighing roughly 500,000 pounds, arrived on a barge at Vulcan Stone&#8217;s quarry in Havre De Grace. Flanigan shaped up a stone ramp so the rig could be driven off the barge, and even supplied two dozers to help stabilize the barge during unloading.</p>
<p><span id="more-387"></span></p>
<p>The huge rig was simultaneously pushed and pulled by massive trucks making up a 144-wheeler with a gross weight of roughly 900,000 pounds and standing 26 feet high. The rig made a slow crawl, with a top speed of 5 mph, over the next couple of weeks to its final destination in Peach Bottom, PA.</p>
<p>Flanigan and Sunrise Safety Services helped HAKE Rigging cross I-95 by building a temporary bridge over the I-95 median and supplying maintenance of traffic. The temporary bridge was needed because the rig weighed too much to cross the MD-155 bridge over I-95 safely. Instead the rig had to go down the exit ramp on the east side of the highway, cross the median, and then make its way up the west side.</p>
<p>Because of proper planning, attention to detail, and a proper concern for safety, the &#8220;BIG Move&#8221; was also a &#8220;BIG Success&#8221;. Hats off to the following Flanigan employees for a job well done: Will Lattea, Mike Klohr, Ellis Wellen, Billy Marquez, John Hahn, Tim Harmon, Carl Cantrell, Frank Toledo, Brian Crandell, Tim Knox, Terrance Granger, Derrick Jackson, Kevin Parker and Todd Radomsky.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.pflanigan.com/blog/feature-job-hake-rigging-250-ton-transfomer/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

