Projects

runway10-28

Runway 10-28 at BWI Thurgood Marshall Airport

P. Flanigan & Sons completed a rehabilitation of the primary runways at BWI Thurgood Marshall Airport. Work on this project consisted of 69,500 tons of asphalt paving, 347,900 SY of pavement milling,

Read More

P. Flanigan & Sons completed a rehabilitation of the primary runways at BWI Thurgood Marshall Airport. Work on this project consisted of 69,500 tons of asphalt paving, 347,900 SY of pavement milling, over 100,000 CY of unclassified excavation, all new runway electrical installation, and the construction of a new MSE Wall at the end of the runway. A majority of the work for this project was completed during a 60 day runway shutdown in August and September 2012.

Read Less

Baltimore City Public Schools

Baltimore City Public Schools

P. Flanigan & Sons was chosen to participate in a three year maintenance contract with the Baltimore City Public School System. Work includes milling and resurfacing asphalt parking lots and roadways, replacing curb and sidewalk,

Read More

P. Flanigan & Sons was chosen to participate in a three year maintenance contract with the Baltimore City Public School System. Work includes milling and resurfacing asphalt parking lots and roadways, replacing curb and sidewalk, structure adjustments, inlet repairs, stairway repair and replacement, seeding and mulching, and speed bump replacement. These upgrades to the Baltimore City Public School properties greatly improve the safety for students and facility members.

Read Less

MD 7 to MD 150

Resurfacing and Safety Improvements on MD 695 from MD 7 to MD 150

This project, located along the inner loop of MD 695, consisted of hot mix asphalt grinding and resurfacing, partial-depth patching, drainage improvements, concrete sidewalk, raised pavement markings and detectable warning surface.

Read More

This project, located along the inner loop of MD 695, consisted of hot mix asphalt grinding and resurfacing, partial-depth patching, drainage improvements, concrete sidewalk, raised pavement markings and detectable warning surface. This work was completed in July 2012 for the Maryland State Highway Administration.

Read Less

Fairfield

Fairfield Ecological Industrial Park

This project for Baltimore City and the Maryland State Highway Administration consisted of four main deteriorated roadways that required complete rehabilitation including excavating over 30,000 CY of asphalt, concrete curb, and concrete sidewalk.

Read More

This project for Baltimore City and the Maryland State Highway Administration consisted of four main deteriorated roadways that required complete rehabilitation including excavating over 30,000 CY of asphalt, concrete curb, and concrete sidewalk. Crews also placed over 15,000 CY of P. Flanigan & Sons SHA approved RC-GAB and approximately 18,000 tons of hot mix asphalt. The project was completed 10 months ahead of schedule.

Read Less

BaltimoreGrandPrix

Baltimore Grand Prix Light Rail Crossing

P. Flanigan & Sons paved over the Light Rail Crossing at Howard Street and Conway Street in preparation for the 2012 Baltimore Grand Prix Race.

Read More

P. Flanigan & Sons paved over the Light Rail Crossing at Howard Street and Conway Street in preparation for the 2012 Baltimore Grand Prix Race. Crews placed specialized construction fabric over the tracks and paved it with hot mix asphalt. Within two hours of the race’s end, crews returned the intersection and track crossing to its original condition.

Read Less

Runway 10-28 Intersection

Intersection of Runways 10-28 and 15R-33L

The intersection of the two main commercial runways at BWI Thurgood Marshall Airport was shut down for 54 hours in August 2011 while Flanigan crews completed the installation of traffic control devices, variable-depth milling of existing pavement,

Read More

The intersection of the two main commercial runways at BWI Thurgood Marshall Airport was shut down for 54 hours in August 2011 while Flanigan crews completed the installation of traffic control devices, variable-depth milling of existing pavement, placed approximately 12,600 tons of hot mix asphalt, laid multiple lifts of new full-depth pavement and new shoulder pavement, and installed temporary lighting and pavement markings.

Read Less

FEEDBACK

Feedback

Contact us!
  1. (required)
  2. (valid email required)
 

cforms contact form by delicious:days

 

Close