Concrete Slab Poured At BWI
Monday, May 31st, 2010

We are moving along very efficiently with this project at BWI. We have finally poured the concrete slabs after starting from scratch on this area.
This entry was posted on
Monday, May 31st, 2010 at
4:38 am and is filed
under Blog. You
can follow any responses to this entry
through the RSS 2.0
feed.